Last week we re-filmed parts of our opening title in St. Johns Wood high street. It went very well and we got a lot of footage shoot. I acted in the film and also edited the footage so that it can be cut and pasted in to our final opening sequence so hopefully it will be improved. We have worked very hard at the re shoot James Vanger was our directer and Julian Wogman was our producer both of them have tried there best to direct and producer me so i did my best to be a good actor in it.


When we flimed.

We filmed in St. Johns Wood on the following dates:

• 06/12/2009

• 07/12/2009

• 10/12/2009

• 12/12/2009

• 19/4/2010 - re-shoot for movie.

We filmed in our locations for about 2 hours on each date.

From 12/09 to 03/10 - we were Editing.

on the 17/03/10 - we burned our film to DVD.

17/03/10 - 25/03/10 - We worked on our power point presentation.